H. G. R. Mews Community Centre replacement

Construction for the new community centre in Mundy Pond Park, to replace the H.G.R. Mews Community Centre, is well underway.
Since Fall 2019, staff have been working to advance the design of the new building, incorporating what was heard through the engagement processes in 2018 and 2019.
Check out the visuals in the document library including an updated exterior rendering, the gymnasium with the elevated walking track, and the leisure pool, in addition to the other visuals added throughout the project.
Construction for the new community centre in Mundy Pond Park, to replace the H.G.R. Mews Community Centre, is well underway.
Since Fall 2019, staff have been working to advance the design of the new building, incorporating what was heard through the engagement processes in 2018 and 2019.
Check out the visuals in the document library including an updated exterior rendering, the gymnasium with the elevated walking track, and the leisure pool, in addition to the other visuals added throughout the project.
-
Public Engagement: H.G.R Mews Community Centre Replacement New Proposed Site Location at Mundy Pond Park
Share Public Engagement: H.G.R Mews Community Centre Replacement New Proposed Site Location at Mundy Pond Park on Facebook Share Public Engagement: H.G.R Mews Community Centre Replacement New Proposed Site Location at Mundy Pond Park on Twitter Share Public Engagement: H.G.R Mews Community Centre Replacement New Proposed Site Location at Mundy Pond Park on Linkedin Email Public Engagement: H.G.R Mews Community Centre Replacement New Proposed Site Location at Mundy Pond Park linkCLOSED: This discussion has concluded.The public are invited to one of two engagement sessions to provide feedback on a new proposed site location for the replacement of the H.G.R. Mews Community Centre at Mundy Pond Park.
The city is proposing an alternate location to the gravel parking lot across from the current Mews Centre because of building needs, and the opportunity to position the facility in an existing recreation hub at Mundy Pond Park.
Please drop-in at your convenience to one of the two scheduled sessions for an opportunity to talk with staff about the potential location for the Centre, and to share your opinions and concerns.
Tuesday, July 30, 2019
· 10 a.m. to noon
· 6 to 8 p.m.
H.G.R. Mews Community Centre
40 Mundy Pond Road
Please note that the focus of the drop-in sessions is to obtain feedback about the new proposed site only. Public engagement about programming and amenities took place in 2018, and the ‘What We Heard’ document is available here.
Comments can also be provide on this page here.
The City of St. John’s wants to create a city where people feel connected, have a sense of belonging and are actively engaged in community life. This project is identified in the Our City, Our Future 2019 Action Plan under the goal to and deliver programs, service and public spaces that build safe, healthy and vibrant communities.
-
Drill Rig Operation - Mundy Pond Park
Share Drill Rig Operation - Mundy Pond Park on Facebook Share Drill Rig Operation - Mundy Pond Park on Twitter Share Drill Rig Operation - Mundy Pond Park on Linkedin Email Drill Rig Operation - Mundy Pond Park linkCLOSED: This discussion has concluded.A drill rig will be operating at Mundy Pond Park, near Blackler Avenue, Blackmarsh Road and Melville Place, starting on Wednesday, June 5 and continuing for approximately five days. Work will take place weekdays between 7 a.m. and 7 p.m.
The purpose of the work is to collect information for installing new lights for the softball field, new playground equipment, and use of the existing soccer field as a potential location for the H.G.R. Mews Centre replacement.
Noise from the drilling process is anticipated; however, weather and atmospheric conditions such as cloud cover may intensify the sound.
Access to Mundy Pond Park will not be impeded by this work. Residents are asked to respect site safety measures put in place by the contractor. Areas where active drilling is occurring will be cordoned off with pylons and appropriate safety signage.
-
Update on H.G.R. Mews Centre Replacement Location
Share Update on H.G.R. Mews Centre Replacement Location on Facebook Share Update on H.G.R. Mews Centre Replacement Location on Twitter Share Update on H.G.R. Mews Centre Replacement Location on Linkedin Email Update on H.G.R. Mews Centre Replacement Location linkCLOSED: This discussion has concluded.The parking lot across the street from the Mews Centre, which was proposed for the replacement, is not in a floodplain. However, concerns about loss of green space and other issues were raised through the engagement process last year and, while this site is not excluded, the City is exploring other potential locations in the area. Further engagement and communications will be happening soon to discuss this with the neighbourhood.
-
Geotechnical investigation
Share Geotechnical investigation on Facebook Share Geotechnical investigation on Twitter Share Geotechnical investigation on Linkedin Email Geotechnical investigation linkCLOSED: This discussion has concluded.Beginning Tuesday, September 11, 2018, and continuing for approximately 5 days, a drill rig will be operating on the gravel parking lot located on the corner of Pearce Avenue and Mundy Pond Road. This is to facilitate a geotechnical investigation of the property in relation to the site being a proposed location for a new facility which will replace the existing Mews Community Centre.
The City’s website provides day-to-day updates on traffic and other service interruptions. Sign up for e-updates to keep advised of Public Advisories or Public Notices here.
-
Public Engagement results: Replacing the H.G.R. Mews
Share Public Engagement results: Replacing the H.G.R. Mews on Facebook Share Public Engagement results: Replacing the H.G.R. Mews on Twitter Share Public Engagement results: Replacing the H.G.R. Mews on Linkedin Email Public Engagement results: Replacing the H.G.R. Mews linkCLOSED: This discussion has concluded.The City of St. John’s is planning to replace the H.G.R Mews Community Centre. During late May and early June, the city engaged with residents, neighbours, user groups and stakeholders to seek input on facility features, accessibility, potential partnerships, programming and impact on the neighbourhood.
Feedback noted that current programs and services should continue in an updated, welcoming, and accessible space. Additionally, significant feedback was provided on how a new space could build and improve on existing features. The ‘What we Heard’ report is available here
During engagement, current and potential users were asked a series of questions online and in person. The process included:
- Meetings with immediate neighbours
- An online survey and in-person sessions with recreation groups and partners
- project page on EngageStJohn's.ca with over 1,700 visits and 123 active engagements
- A kiosk at the H.G.R Mews community centre with drop in engagement opportunities
- A focus group with newcomers
- Meetings with the City’s Inclusion and Seniors Advisory Committees
Budget for replacement is $24 million. The newly built facility will be of a similar size and scope as the existing centre. The timeline for construction will be available after the design for the new facility is complete.
Stay up to date by checking back to this page, follow the project or sign up to receive project updates.
-
Public engagement public drop-in events at the H.G.R. Mews Community Centre
Share Public engagement public drop-in events at the H.G.R. Mews Community Centre on Facebook Share Public engagement public drop-in events at the H.G.R. Mews Community Centre on Twitter Share Public engagement public drop-in events at the H.G.R. Mews Community Centre on Linkedin Email Public engagement public drop-in events at the H.G.R. Mews Community Centre linkCLOSED: This discussion has concluded.In our planning to replace the Mews Community Centre we're having drop-in open houses for residents to ensure that public concerns are heard within the scope of the project.
City residents can have their say in person from Monday, May 28 to Friday, June 1 at the H.G.R Mews Centre (see the Drop-in schedule on the right for times), or here on TELL US WHAT YOU THINK
The timeline for construction will be available after the public consultation and design is complete.
Follow Project
Document Library
-
Updated Exterior Rendering May 2022 (2.17 MB) (png)
-
Rendering - Gymnasium with Elevated Walking Track May 2022 (2.85 MB) (png)
-
Rendering - Leisure Pool May 2022 (393 KB) (pdf)
-
Rendered Views.pdf (8.34 MB) (pdf)
-
Amenities Overview Mews Replacement.pdf (105 KB) (pdf)
-
Mews Centre - Southwest Corner (2020-08-25).png (9.48 MB) (png)
-
Mews Centre - Birds Eye View (2020-08-28).jpg (2.05 MB) (jpg)
-
A-201 Level 1 Floor Plan.pdf (372 KB) (pdf)
-
A-202 Level 2 Floor Plan.pdf (620 KB) (pdf)
-
What we Heard document - August 2019 (612 KB) (pdf)
-
What we Heard document - 2018 (620 KB) (pdf)
Project Schedule
-
Public Engagement Open
H. G. R. Mews Community Centre replacement has finished this stageThis consultation is Open for contributions.
-
Under Review
H. G. R. Mews Community Centre replacement has finished this stage -
What we Heard (July 2018) released
H. G. R. Mews Community Centre replacement has finished this stage -
Tender Awarded to Englobe
H. G. R. Mews Community Centre replacement has finished this stage -
Geotechnical work underway
H. G. R. Mews Community Centre replacement has finished this stage
-
Geotechnical work completed
H. G. R. Mews Community Centre replacement has finished this stage -
Public Engagement on new proposed location OPEN
H. G. R. Mews Community Centre replacement has finished this stage -
Feedback from consultation being reviewed
H. G. R. Mews Community Centre replacement has finished this stageStaff are reviewing all of the feedback.
-
What we Heard released - August 16, 2019
H. G. R. Mews Community Centre replacement has finished this stageThe What we Heard is available here
-
Council Decision - August 19, 2019
H. G. R. Mews Community Centre replacement has finished this stageOn Monday, Aug 19, City council voted in favor of the Mundy Pond Location for the replacement of the H.G.R Mews Centre. The Decision Note from the meeting is available here.
The Council agenda is online http://stjohns.ca/city-hall/about-city-hall/council-and-committee-minutes-and-agendas . Minutes will be posted following council’s adoption at next regular meeting on September 3rd.
-
Design Phase
H. G. R. Mews Community Centre replacement has finished this stageDesign plan shared with Council and public Sept. 2. 2020
-
Construction
H. G. R. Mews Community Centre replacement is currently at this stageConstruction began September 2021 and is set to continue until 2025.
-
New Building Open
this is an upcoming stage for H. G. R. Mews Community Centre replacementWhile construction of the facility is complete, there are further delays for the opening of the facility which was anticipated to take place early in 2025. More information pertaining to the Grand Opening will be posted here and on our other social media outlets as soon as it is available.
Who do I need to contact
-
Council Lead - Community Services
Phone 576-8363 Email soleary@stjohns.ca -
Manager- Facilities Engineering
Department of Planning, Engineering & Regulatory Services
TKEmail tknopp@stjohns.ca