H. G. R. Mews Community Centre replacement
Construction for the new community centre in Mundy Pond Park, to replace the H.G.R. Mews Community Centre, is well underway and is scheduled to be completed Fall 2023.
Since Fall 2019, staff have been working to advance the design of the new building, incorporating what was heard through the engagement processes in 2018 and 2019.
Check out the new visuals in the document library including an updated exterior rendering, the gymnasium with the elevated walking track, and the leisure pool, in addition to the other visuals added throughout the project.
Construction for the new community centre in Mundy Pond Park, to replace the H.G.R. Mews Community Centre, is well underway and is scheduled to be completed Fall 2023.
Since Fall 2019, staff have been working to advance the design of the new building, incorporating what was heard through the engagement processes in 2018 and 2019.
Check out the new visuals in the document library including an updated exterior rendering, the gymnasium with the elevated walking track, and the leisure pool, in addition to the other visuals added throughout the project.
-
A new proposed site location for the H.G.R. Mews Community Centre replacement has been identified.
over 2 years agoShare on Facebook Share on Twitter Share on Linkedin Email this link71 ResponsesCLOSED: This discussion has concluded.The new site accommodates multiple recreation offerings all in one location. Check out the Frequently Asked Questions (FAQ) and map on this page and leave your comments and feedback here.
Go to discussionReplies Closed
Document Library
-
Updated Exterior Rendering May 2022 (2.17 MB) (png)
-
Rendering - Gymnasium with Elevated Walking Track May 2022 (2.85 MB) (png)
-
Rendering - Leisure Pool May 2022 (393 KB) (pdf)
-
Rendered Views.pdf (8.34 MB) (pdf)
-
Amenities Overview Mews Replacement.pdf (105 KB) (pdf)
-
Mews Centre - Southwest Corner (2020-08-25).png (9.48 MB) (png)
-
Mews Centre - Birds Eye View (2020-08-28).jpg (2.05 MB) (jpg)
-
A-201 Level 1 Floor Plan.pdf (372 KB) (pdf)
-
A-202 Level 2 Floor Plan.pdf (620 KB) (pdf)
-
What we Heard document - August 2019 (612 KB) (pdf)
-
What we Heard document - 2018 (620 KB) (pdf)
Key Dates
-
22 September 2020
-
24 September 2020
Project Schedule
-
Public Engagement Open
H. G. R. Mews Community Centre replacement has finished this stageThis consultation is Open for contributions.
-
Under Review
H. G. R. Mews Community Centre replacement has finished this stage -
What we Heard (July 2018) released
H. G. R. Mews Community Centre replacement has finished this stage -
Tender Awarded to Englobe
H. G. R. Mews Community Centre replacement has finished this stage -
Geotechnical work underway
H. G. R. Mews Community Centre replacement has finished this stage
-
Geotechnical work completed
H. G. R. Mews Community Centre replacement has finished this stage -
Public Engagement on new proposed location OPEN
H. G. R. Mews Community Centre replacement has finished this stage -
Feedback from consultation being reviewed
H. G. R. Mews Community Centre replacement has finished this stageStaff are reviewing all of the feedback.
-
What we Heard released - August 16, 2019
H. G. R. Mews Community Centre replacement has finished this stageThe What we Heard is available here
-
Council Decision - August 19, 2019
H. G. R. Mews Community Centre replacement has finished this stageOn Monday, Aug 19, City council voted in favor of the Mundy Pond Location for the replacement of the H.G.R Mews Centre. The Decision Note from the meeting is available here.
The Council agenda is online http://stjohns.ca/city-hall/about-city-hall/council-and-committee-minutes-and-agendas . Minutes will be posted following council’s adoption at next regular meeting on September 3rd.
-
Design Phase
H. G. R. Mews Community Centre replacement has finished this stageDesign plan shared with Council and public Sept. 2. 2020
-
Construction
H. G. R. Mews Community Centre replacement is currently at this stageConstruction began September 2021 and is set to continue until Fall 2023.
-
New Building Open
this is an upcoming stage for H. G. R. Mews Community Centre replacementOpening is scheduled for Fall 2023 completion.
FAQ
- What is the current status of plans to replace the Mews?
- What happened to the first location the City proposed in 2018 – at the gravel parking lot across from the current Mews Centre?
- Which stakeholders are being consulted about this project?
- What is the status of the Canadian Tire Jumpstart Charities Accessible playground?
Follow Project
Who do I need to contact
-
Council Lead - Community Services
Phone 576-8363 Email soleary@stjohns.ca -
Email csquires@stjohns.ca -
Manager- Facilities Engineering
Department of Planning, Engineering & Regulatory Services
TKEmail tknopp@stjohns.ca -
Supervisor - Capital Works
Department of Planning, Engineering & Regulatory Services
PMEmail pmcdonald@stjohns.ca
Having trouble navigating this page?
Contact us at engage@stjohns.ca or call 576-8554