2022-23 CIPP Watermain Lining

Share 2022-23 CIPP Watermain Lining on Facebook Share 2022-23 CIPP Watermain Lining on Twitter Share 2022-23 CIPP Watermain Lining on Linkedin Email 2022-23 CIPP Watermain Lining link

Consultation has concluded

A blue water main pipe resting on grass

Watermains on various streets in the Churchill Square area are scheduled for rehabilitation work (CIPP Lining) during the 2022 and 2023 construction seasons.

The work will take place between early September 2022 to November 2022, and then stop for the winter. The work will begin again in Spring 2023 and is anticipated to be completed by Fall 2023.

This project will involve cleaning and structural lining of the existing watermain which will reduce maintenance issues, improve water service, and extend the life of the existing watermain in this area.

Businesses and homes will receive water through a temporary, above-ground, water piping system installed along the street during construction. The contractor will notify residents directly if their property is included in the project area and indicate whether they will require access to the property to provide temporary water service. Two-way traffic and pedestrian access will be maintained where possible but delays can be expected. The contractor will make every effort to maintain driveway access to properties located within the work site.

You can find information related to the project on this page. Have a look through the Frequently Asked Questions and if you still have questions, you can post them in the Questions and Answers tool.

This page is not intended to replace other information such as Public Advisories or Public Notices (e-updates). For day-to-day updates such as traffic or water interruptions, etc. check the City's website. To keep informed of the city’s traffic advisories please sign up for e-updates.

Watermains on various streets in the Churchill Square area are scheduled for rehabilitation work (CIPP Lining) during the 2022 and 2023 construction seasons.

The work will take place between early September 2022 to November 2022, and then stop for the winter. The work will begin again in Spring 2023 and is anticipated to be completed by Fall 2023.

This project will involve cleaning and structural lining of the existing watermain which will reduce maintenance issues, improve water service, and extend the life of the existing watermain in this area.

Businesses and homes will receive water through a temporary, above-ground, water piping system installed along the street during construction. The contractor will notify residents directly if their property is included in the project area and indicate whether they will require access to the property to provide temporary water service. Two-way traffic and pedestrian access will be maintained where possible but delays can be expected. The contractor will make every effort to maintain driveway access to properties located within the work site.

You can find information related to the project on this page. Have a look through the Frequently Asked Questions and if you still have questions, you can post them in the Questions and Answers tool.

This page is not intended to replace other information such as Public Advisories or Public Notices (e-updates). For day-to-day updates such as traffic or water interruptions, etc. check the City's website. To keep informed of the city’s traffic advisories please sign up for e-updates.

Consultation has concluded

Can't find what you are looking for on this page? Post your question here or reach out to the project lead.