Hebron Way Extension
Consultation has concluded
The City is completing road construction work to connect Hebron Way with Major’s Path. The scope of work for this project includes:
- Extending Hebron Way to Major’s Path
- Connecting Carolyn Drive to Hebron Way (north bound only)
- Roundabout construction at the intersection of Hebron Way and Major’s Path
- Water and sewer infrastructure
- Sidewalks and multi-purpose trail
While motor vehicle traffic and pedestrian access will be maintained during construction, there will be some disruptions and slowdowns. The City will make every effort to minimize disruptions and to maintain traffic flow, especially during peak rush hour. We ask the public to obey and follow all posted signage in and near the construction zone.
A traffic advisory will be posted to the city’s website before construction begins on Major's Path.
This page is not intended to replace other information such as Public Advisories or Public Notices (e- updates), for day to day updates such as traffic or water interruptions, etc. check the City's website. To keep informed of the city’s traffic advisories please sign up for e-updates at www.stjohns.ca.