News

Traffic Pilots Projects removed from downtown

16 November 2017

Infrastructure to support changes for two traffic pilot projects downtown has been removed in advance of snow clearing operations beginning for the winter. Former conditions have now been reinstated. 

In August, the City announced two traffic pilot projects downtown: the reconfiguration of Church Hill with Veteran’s Square; and Duckworth Street, Plymouth Road one-way loop. The purpose of these projects was to test enhancements to pedestrian safety, traffic flow, and parking availability. 

The City sought public feedback on these and other pilot projects through an online survey which is now closed.