Traffic Pilot Projects

The City was testing several traffic solutions around town on a temporary basis over the fall. The expectation was that they would reduce speeding, increase safety, and clear up some confusing spots.

Over the course of the trial period, feedback from the public and technical data was collected. This will be combined with the public feedback survey (now closed) in a report to Council who will decide whether or not these pilot projects will become permanent installations.

The City was testing several traffic solutions around town on a temporary basis over the fall. The expectation was that they would reduce speeding, increase safety, and clear up some confusing spots.

Over the course of the trial period, feedback from the public and technical data was collected. This will be combined with the public feedback survey (now closed) in a report to Council who will decide whether or not these pilot projects will become permanent installations.

  • Traffic Pilot Projects Removed from Downtown

    2 months ago

    Infrastructure to support changes for two traffic pilot projects downtown has been removed in advance of snow clearing operations for the winter. Former conditions have now been reinstated.

    In August, the City announced two traffic pilot projects downtown: the reconfiguration of Church Hill with Veteran’s Square; and Duckworth Street, Plymouth Road one-way loop. The purpose of these projects was to test enhancements to pedestrian safety, traffic flow, and parking availability.



    Infrastructure to support changes for two traffic pilot projects downtown has been removed in advance of snow clearing operations for the winter. Former conditions have now been reinstated.

    In August, the City announced two traffic pilot projects downtown: the reconfiguration of Church Hill with Veteran’s Square; and Duckworth Street, Plymouth Road one-way loop. The purpose of these projects was to test enhancements to pedestrian safety, traffic flow, and parking availability.



  • Duckworth-Plymouth Loop

    5 months ago

    The Duckworth Street, Plymouth Road, and Quidi Vidi Road area was tested for improved traffic flow and enhanced pedestrian safety. The temporary installations have now been removed in advance of snow clearing operations for the winter.


    The Duckworth Street, Plymouth Road, and Quidi Vidi Road area was tested for improved traffic flow and enhanced pedestrian safety. The temporary installations have now been removed in advance of snow clearing operations for the winter.


  • Veteran’s Square Reconfiguration

    5 months ago

    Church Hill in the vicinity of Veteran’s Square was narrowed as part of the traffic pilot. The temporary installations have now been removed in advance of snow clearing operations for the winter.


    Church Hill in the vicinity of Veteran’s Square was narrowed as part of the traffic pilot. The temporary installations have now been removed in advance of snow clearing operations for the winter.


  • Temporary Mini-Roundabout in Kenmount Terrace

    5 months ago

    A mini-roundabout design was tested at the intersection of Great Eastern Drive and Petite Forte Drive in the Kenmount Terrace area. The temporary installations have now been removed in advance of snow clearing operations for the winter.


    A mini-roundabout design was tested at the intersection of Great Eastern Drive and Petite Forte Drive in the Kenmount Terrace area. The temporary installations have now been removed in advance of snow clearing operations for the winter.


  • Winter Avenue

    5 months ago

    City staff have now completed the data collection phase of the Winter Avenue traffic calming project. The no-entry restriction via Kings Bridge Road will remain in place until a final decision is made by Council.  

    The City implemented the Winter Avenue traffic calming project in August to address traffic volume and speed concerns raised by residents living in the area, as per the process set out in the city’s Traffic Calming policy.  



    City staff have now completed the data collection phase of the Winter Avenue traffic calming project. The no-entry restriction via Kings Bridge Road will remain in place until a final decision is made by Council.  

    The City implemented the Winter Avenue traffic calming project in August to address traffic volume and speed concerns raised by residents living in the area, as per the process set out in the city’s Traffic Calming policy.  



  • Public feedback survey

    27 days ago
    CLOSED: This discussion has concluded.

    The online public feedback survey is now closed.

    The public feedback received through the survey will inform the evaluation and be presented to Council. Once presented, Council will determine if the pilot project changes will become permanent at these locations.

    The online public feedback survey is now closed.

    The public feedback received through the survey will inform the evaluation and be presented to Council. Once presented, Council will determine if the pilot project changes will become permanent at these locations.